HIGH PRESSURE TANK INSTALLATION

Khoemacau Mine in Northern Botswana, https://www.khoemacau.com/project-development-exploration/overview Contract administration by Fluor Inc ,https://www.fluor.com/ is not for Sissy's !! Throw in all the another stresses and complications -- Like the Covid 19 lock-down and contractual disturbances. No Material, Long Que lines at the boarder, Steel shortages...... What did Savanna Tanks do -- The panel sizes used was the old imperial type , 4 X 4ft or 1.22 x 1.22 so all sections were pre-assembled and delivered to site.