Serowe Primary Hospital

Installed in effectively 3 days + Pipework and ready to receive water -- The installation was completely sub-assembled in Ramotswa - Delivered by our 60 Ton crane truck (Botswana's biggest) and simply hoisted into place -- As simple a 1,2,3 or A,B,C (Radio Botswana educational sound track...for those of us old enough to remember !!! ) Client -- Land Mark Contractors Pty Ltd (Call Ben The MD for a reference) Equipment -- Savanna Tanks 30 kl in 10 Gs Stand Stand -- Savanna Tanks Computer designed and laser cut gusset plates Galvanization -- SABS -- Armco Edenvale

Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2020 by Savanna Design  Proudly prowered  Mokoldi Inc

  • Savanna Tanks
  • YouTube Social  Icon